Energy infrastructure / Texas field guide

Good land is only
the beginning.

Where can a 100–200 MW power plant and AI data center actually work? Follow the energy, the land and the evidence. Explore twelve technical decisions, seven regional lenses and real Texas properties—without losing the thread.

Start with a 2-minute overview. Keep going into the engineering, the land and the decisions.

Conceptual campus: natural gas feeds power generation, power feeds the AI compute halls, fiber connects both ways, optional grid connection, and a cooling loop with supply and return. Concept only, not a parcel plan, not to scale.
01 / UnderstandSix entry points · twelve deeper chapters02 / CompareFive advertised Texas properties03 / VerifyEvidence before commitment

Choose your route / Start anywhere

One question leads to the next.

The 30-second answer

Start with the things
that can stop the project.

A low land price cannot solve missing fuel, unavailable power or an unworkable permit. Clear these gates before spending heavily on design.

01 / DECISION GATE

Power you can actually use

A power line is a lead. A deliverable MW commitment is evidence.

What evidence do we need?

Request the serving utility, study results, energization date, upgrade scope, costs and operating restrictions. For an islanded plant, prove reliability, black start and fuel continuity. Confirm the grid operator; not all Texas sites are in ERCOT.

ERCOT large-load process ↗
Explore this decision in depth →
02 / DECISION GATE

Gas that reaches the plant

Enough gas, at the right pressure, on the day you need it.

What evidence do we need?

Obtain the pipeline operator’s written flow and pressure study, firm transport terms, gas quality, tap and lateral scope, easements and construction schedule. A pipeline easement does not grant a right to take gas.

Find pipeline leads ↗
Explore this decision in depth →
03 / DECISION GATE

Land you can build on

Gross acreage is the starting point. Usable acreage decides the layout.

What evidence do we need?

Commission a survey and test fit for compute halls, generation, cooling, setbacks, roads, drainage, laydown and expansion. Screen flood zones, wetlands, geology, easements and mineral access. No single acreage cutoff fits every architecture.

Start the flood screen ↗
Explore this decision in depth →
04 / DECISION GATE

Permission to operate

A buildable parcel still needs an approvable plant.

What evidence do we need?

Have an air consultant define the permitting path, emissions controls, modeling, public process and realistic schedule. Check local land use, noise, fire protection, water and discharge obligations. Do not assume “no zoning” means no permits.

Explore air permitting ↗
Explore this decision in depth →
05 / DECISION GATE

Cooling and connections

Heat must leave. Data must move. Both need designed routes.

What evidence do we need?

Request a peak-summer heat and water balance covering generation and compute. Secure water rights and supply where required. Seek carrier route maps, diverse entrances, construction costs and tested latency. Closed-loop liquid cooling still needs heat rejection.

Use the diligence checklist ↗
Explore this decision in depth →
06 / DECISION GATE

A deal that survives diligence

Buy a workable delivery schedule, not just attractive acreage.

What evidence do we need?

Resolve title, minerals, access, site control and development rights. Price the gas lateral, substation, roads, fiber, ground improvement and cooling. Compare all-in cost and time-to-power before ranking by asking price.

Build the evidence package ↗
Explore this decision in depth →

Illustrated insight

A data center is a chain of promises.

GRIDON-SITESWITCHGEARAI LOADTwo sources still need a designed transfer strategy
SEL explanatory schematic · not an engineered design

Gas becomes power. Power becomes computation. Almost all of that electrical energy becomes heat.

That is why the best parcel cannot be selected from acreage and transmission maps alone. Fuel, electrical architecture, cooling, communications and permissions must work together at the same load and on the same schedule.

The decision that changes everything
Define whether 100–200 MW means net campus supply or IT equipment load before comparing a land offering with a power concept.

Make the scale tangible

What does 100 MW mean?

Choose the meaning of MW first. Power-plant output and IT load are different numbers.

100 MWCampus electrical supply
80 MWIT load supported at selected PUE
16.8–24.0MMcf/day gas · illustrative range
See the calculation and its limits

Gas = net campus MW × 24 × heat rate ÷ 1,000. Assumed net heat rate: 7–10 MMBtu/MWh; assumed gas heating value: 1,000 Btu/scf; 24-hour full output. These are scenario inputs, not a selected equipment guarantee. Redundancy, summer derating, reserve margin and transient response need a separate plant design. Gas volume changes with actual gas quality.

PUE includes cooling and other facility overhead. A 100 MW campus at PUE 1.25 supports approximately 80 MW of IT load. Land and water requirements need a site-specific layout and heat balance; this tool does not certify either.

A useful distinction

Promising is not
power-ready.

We label what a listing says, what the evidence establishes, and what must happen next.

Apply the criteria to real land ↗
Listing claim

A seller or broker advertises infrastructure, timing or development potential. This is a lead to investigate.

Verified document

A dated agreement, technical study or permit supports a specific conclusion. None of the public listings reviewed establishes a fully ready 100–200 MW campus.

SEL assessment

Our preliminary interpretation of the available evidence. An unknown stays unknown; it is never converted into a passing score.

Field notes / What the listings teach us

Five leads. Five different first questions.

Swipe or scroll sideways to explore all five.
Jarrell

A concept needs commitments.

The advertised 200 MW concept is the reason to ask for operator studies and permit records.

Open the case →
Del Rio

The land price is only the entry ticket.

Fuel delivery and utility works decide whether the low asking price becomes a real advantage.

Open the case →
Abilene

A neighbor is a clue.

An adjacent data-center corridor does not allocate its capacity to the tract across the road.

Open the case →
Crockett

Voltage is not a reservation.

Substation adjacency can shorten a route; only the utility can establish the available service.

Open the case →
Clifton

What rights are you paying for?

A premium location still needs an enforceable path to delivered power.

Open the case →